top of page

Owner-Side Construction Management in Costa Rica

Keep Budget, Progress and Decisions Visible Throughout Construction

Your contractor is selected or work is about to begin. You need a clear owner-side view of how the construction is progressing.

Corbán’s Owner-Side Construction Package combines representation, budget and schedule follow-up, change review, coordination, reporting and agreed handover support during the construction stage.

Before work begins, your proposal states the scope, deliverables, exclusions, responsibilities, review points, fee, schedule and recommended next stage.

It is intended primarily for custom homes, vacation residences, rental villas and selected boutique projects with a contractor and a defined construction direction.

THE SERVICE

Know What Will Be Followed During the Construction Stage

The Owner-Side Construction Package organizes execution-stage information around the owner’s approved project. It follows budget, schedule, changes and pending decisions, helping you understand where the work stands and what requires action during the build.

You are commissioning owner-side construction management—not the construction itself. The proposal defines visits, reviews, reports, coordination, authority and the handover support included.

The owner hires the contractor, who remains responsible for performing the contracted construction work.

THIS SERVICE IS USALLY APPROPRIATE WHEN

You have selected a contractor or are close to starting work.

You want the owner represented throughout construction rather than only for isolated decisions.

You need budget and schedule follow-up linked to changes, reported progress and pending actions.

You want a defined approach to construction progress reporting.

You are living abroad or need help coordinating the project information presented by participants.

You want the scope to include agreed closure and handover support without shifting contractor duties.

KEY BENEFITS

  • See reported progress alongside the agreed budget and schedule.

  • Understand changes and pending decisions before they create confusion.

  • Keep construction records and handover actions organized for the owner.

WHAT YOU RECEIVE

  • Owner’s Representation during the agreed stage

  • Budget and schedule follow-up within the scope

  • Change, issue and pending-decision records

  • Coordinated reporting and project communications

  • Construction documentation organized at the agreed level

  • Support for closure and handover as expressly listed

WHAT IT INCLUDES

Service at a Glance

A construction-stage package that connects owner representation, cost and schedule follow-up, changes, coordination and reporting through agreed handover.

What's Included

  • Property location and status

  • Intended use and approximate area

  • Required spaces and functional priorities

  • Survey, site plan or property information, if available

  • Existing concepts, designs or drawings

  • Reference images

  • Known site conditions or restrictions

  • Target investment range, if available

  • Current project stage

  • Whether you are in Costa Rica or abroad

What's Not Included

  • Physical construction or management of contractor labor

  • Design from scratch or automatic redesign services

  • Replacement of contractor technical obligations

  • Automatic substitution of Dirección de Obra or Inspección

  • Unlimited site presence or daily supervision by default

  • Legal representation or dispute adjudication

  • Unapproved spending or automatic payment authority

  • Guarantees of final cost, quality or completion dates

  • Post-handover operation or maintenance unless included

Where This Service Fits

1

Advisory & Feasibility

Clarify whether the property and project are ready to advance.

3

Architectural Design

Develop spaces, circulation, envelope, openings, materials and passive criteria.

5

Pre-Construction Decisions

Prepare for budgeting, scheduling and contractor comparison.

The Owner-Side Construction Package begins when a contractor is selected or construction is approaching. The starting review identifies the approved information, budget and schedule references, participant responsibilities and current project status.

2

Preliminary Design

Explore the concept, layout, form and initial site relationship.

4

Engineering & Coordination

Develop and coordinate the required technical disciplines.

6

Owner-Side Construction Support

Maintain owner-side visibility during construction.

STILL DECIDING WHICH CONTRACTOR TO HIRE?

Choose the Pre-Construction Decision Package when scope, budget, schedule and contractor comparison still need preparation.

What We Need From You

SHARE THE INFORMATION CURRENTLY AVAILABLE, SUCH AS:

  • Property location and construction stage

  • Selected contractor and project team details

  • Construction agreement and defined work scope

  • Approved drawings and specifications

  • Agreed budget and construction schedule

  • Permits and assigned responsibilities

  • Recent reports and recorded site progress

  • Pending changes, concerns and owner decisions

  • Reporting and approval arrangements

  • Whether you are local or abroad

Corbán identifies missing records and access needs. Follow-up requires current information and clear responsibilities; the package does not remove existing uncertainties.

BEST FOR

Residential and Selected Boutique Projects

Single-family home

Owners of primary homes, vacation residences and rental villas needing coordinated owner-side visibility throughout construction.

Tourism project

Lodges and small hospitality projects tracking work, decisions and the documentation needed for an agreed handover.

Commercial or Mixed-Use

Selected developments requiring organized reporting, budget and schedule follow-up during the execution stage.

INVESTMENT

How to get your quote

Share the contractor information, project scope, construction stage and available records. Corbán will confirm the support needed and issue a proposal defining deliverables, exclusions, authority, fee, duration, reporting and handover scope.

RESULTS

An owner-side record of construction progress, cost and time issues, changes and handover actions—without confusing owner-side follow-up with the contractor’s duty to perform the work.

WHAT TO CONFIRM BEFORE HIRING

We Answer Your Questions

Does Corbán Take Over the Contractor’s Work or Responsibilities?

How Often Will I Receive Reports or Site Updates?


The proposal specifies frequency and format. Continuous site presence, drone records or daily updates are not included by assumption.

Do You Approve Payments and Changes Automatically?


No. Review and recommendation are different from approval. Any delegated authority must be expressly agreed with the owner.

What Does Handover Support Include?


The scope identifies the closure records, outstanding-item follow-up and handover coordination included. Corbán does not replace contractor warranties, formal acceptance requirements or specialist testing.

Can This Support an Owner Living Outside Costa Rica?


Yes. Digital reporting and decision coordination can support remote ownership, alongside the site involvement expressly included.

How Is This Different From Full-Cycle Project Management?


This package focuses on execution after contractor selection. Full-Cycle Owner-Side Project Management also connects design, technical coordination and preparation for the construction decision.

WHAT HAPPENS AFTER ARCHITECTURAL DESIGN?

Keep Exploring

Owner’s Representation

Arrange a focused continuing mandate for unresolved owner-side decisions that fall outside the agreed construction package.

Independent Project Review

Commission a separate assessment of third-party documents when a defined unresolved issue needs its own review.

Project Consultation

Clarify a new project question or the appropriate support needed after the contracted handover stage is complete.

bottom of page